Rapid IGU Quality Assessment from IGCC

IGCC
June 15, 2016
By IGCC
June 15, 2016 - The Insulating Glass Certification Council (IGCC), sponsor of the IGCC/IGMA certification program, North America's leading IG certification and quality assurance organization, is currently testing a pilot program that would enable IG manufacturers to provisionally certify their products in just 4 weeks. The existing full certification takes an average of 24 weeks. Provisional certification would enable the manufacturer to sell a certified product pending the outcome of full ASTM tests.

The Provisional Certification (PC) Program was designed to assess the ability of a manufacturer to take an established type and arrangement of sealant(s) and components, and assemble them to a specified standard. The program was evaluated by a correlation study last year. This study compared the program’s pass/fail data to identical units that were evaluated to IGCC’s existing certification results with surprising precision.

The program utilizes the test methods outlined in ASTM E-2190 for the stability of the gas fill, and the unit’s durability when subjected to high humidity and accelerated weathering environments. Evaluation is made after a shorter exposure time but with more stringent pass/fail criteria, along with additional quality assurance requirements developed by IGCC. PC is not applicable for designs and materials which have no successful track record with ASTM E-2190 tests.

For more information
www.igcc.org

Add comment


Security code
Refresh

Subscription Centre

 
New Subscription
 
Already a Subscriber
 
Customer Service
 
View Digital Magazine Renew


Coming Events

IGMA Summer Conference
July 31-3, 2017
GlassBuild
September 12-14, 2017
IGMA Winter Conference
January 31-2, 2018
Fensterbau Frontale
March 21-24, 2018
Top Glass
May 17, 2018

Marketplace